Project description
Austria plans to massively expand the production of ‘green gas’ by 2030. Whilst agricultural substrates are well established, significant municipal feedstock streams remain largely untapped, and municipal plant operators such as waste management associations have so far been barely involved in national biomethane strategies, even though they control the feedstock. There are several reasons for the underutilisation of these raw materials: high levels of contaminants in organic waste, fluctuating substrate quantities and qualities, a lack of systemic integration, economic uncertainties and unclear regulatory requirements (EGG expected from 2026).
In Burgenland alone, around 25,000 t/a of biogenic waste is available, of which less than 5 per cent is used for energy recovery. The Großhöflein site offers ideal conditions for a municipal biomethane plant thanks to its existing collection logistics, infrastructure and connection to the gas grid. The Biomethane_2_Grid feasibility study is examining whether a plant feeding into the grid is technically, environmentally and economically viable.
The innovation lies in three aspects:
- Technological: new processes for the removal of impurities and robust fermentation.
- Systemic: optimisation of collection, logistics and quality assurance.
- Organisational: positioning waste management associations as new players in the regional energy transition.
Targeted outcomes:
- Reliable raw material potential and quality data
- Validated technology concepts
- Site-specific plant layout
- Economic feasibility calculations and sensitivity analyses
- Estimation of climate impact
- Risk analysis and implementation roadmap
The project lays the foundations for a regional, scalable biogas strategy, increases local production of renewable gases and enables the efficient utilisation of municipal waste streams.